Concrete staining in Moore

Concrete Staining in Moore

Moore had 62,793 residents at the 2020 census and was hit by violent tornadoes on May 3, 1999 and May 20, 2013, the second an EF5 that killed 24 people. In March 2014 the City adopted a residential code requiring new homes to withstand winds of up to 135 mph, so a large share of its homes and slabs were rebuilt or newly built in the last dozen years.

A city of young slabs

Moore annexed 21.6 square miles in 1961 and became a city in 1962, so even its oldest subdivisions are post-1960s. Then came the tornadoes. The May 3, 1999 storm and the May 20, 2013 EF5, which killed 24 people, flattened large parts of town, and whole streets of houses were rebuilt. In March 2014 the City adopted a residential code requiring new homes to withstand winds of up to 135 mph, and a large share of Moore’s houses and slabs have been built or rebuilt in the years since.

That gives Moore an unusual mix for a 62,793-person city: many garage floors and patios that are only ten or so years old and have never been coloured. A clean, sound slab is the easiest kind to stain, though anything put on it since it was poured still matters.

What sits on a newer slab

Stain has to soak into the concrete to work. A clear sealer or curing compound applied when the house was finished, or an oil spot from the first car parked inside, blocks it. So garage floor staining on a rebuilt home usually starts with testing whether water soaks in, then stripping whatever stops it. In houses that added an in-garage storm shelter, the floor around the hatch gets the same preparation as the rest of the slab.

Back patios on these lots are often plain grey rectangles poured with the house. Staining the patio is a way to give it colour without adding new concrete.

Replacing a driveway first

Some jobs start with new concrete. The City of Moore’s Driveway/Curb Cut Permit Application covers new curb cuts and driveways and the reconstruction of an existing driveway. It asks for the material, width and thickness, and whether a tinhorn (a drain pipe under the approach) is needed. The Inspections Division is at 301 N Broadway, (405) 793-5051, or inspections@cityofmoore.com. The application on file is dated December 2019, so check that it is still the current form. No permit for staining or sealing an existing slab was found.

New concrete needs time to cure before it takes stain, so a fresh driveway is usually coloured weeks after the pour, not days.

Sun and hail on the I-35 corridor

Cleveland County averages 67% sunshine and five or more days a year with hail over an inch. Hail rarely hurts a concrete slab, but sun breaks down the sealer on top. Resealing stained concrete every so often keeps the colour from fading on a south- or west-facing drive.

Nearby areas

Norman continues south down I-35, and Oklahoma City begins just north of Moore near I-240.

Moore concrete questions

My Moore house was rebuilt after 2013. Is the slab ready for stain?
New concrete usually needs about 28 days to cure before stain goes on, so a slab from a rebuild a few years ago is past that. What matters more is what has been put on it since. Old sealers, curing compounds and oil stains stop stain from soaking in, so the slab is tested and cleaned first. Garage floors in rebuilt homes often have only a clear factory sealer that has to come off before acid or water-based stain will take.
Do I need a permit to replace my driveway in Moore before staining it?
Yes, when the concrete itself is replaced. The City of Moore's Driveway/Curb Cut Permit Application covers new curb cuts and driveways and the reconstruction of an existing driveway. It asks for the material, width and thickness, and whether a tinhorn (drain pipe) is needed under the approach. Applications go to the Inspections Division at 301 N Broadway, (405) 793-5051.

Nearby areas we serve

Concrete staining across the Oklahoma City metro:

Free estimate

Tell us about the slab

Tell us the surface, the rough size and the age of the concrete. We’ll call to set up a look at the slab.

  • Slab checked for cracks, old sealer and oil before anything is quoted
  • Colour tested on a corner of your own concrete
  • Acid or water-based stain matched to the slab and the look you want
  • A written quote before any work starts

Tell us about the slab

A quick description is enough to start. We’ll call you back to set up a look.

Prefer to talk? (405) 451-1462

Got it, thank you.

We’ll call to set up a look at your concrete. To talk sooner, call (405) 451-1462